Duck Island | Fenton Construction

Duck Island | Fenton Construction

Duck Island - Waste Transfer Station

  • ClientsHart Rock Group, LLC
  • CategoriesIn Progress | Industrial, Pre-Engineered

Project Description

Fenton Construction has recently been chosen to furnish and erect this 46,500 sq. ft. pre-engineered Butler Building. This building will be equipped with an MR-24 Standing Seam Roof System and Shadowall panels from Butler Manufacturing. Unique features of the building include that it is 46' tall and has 215' clearspan frames. In addition, a small office building will be built adjacent to the main warehouse building. This office will be equipped with an MR-24 Standing Seam Roof System with the TBS Insulation System and eShadowall panels also provided by Butler Manufacturing. Construction expected to start Spring of 2019.


Awesome Image
Awesome Image
Awesome Image
Awesome Image